Lesley Park Road, CR0

I'm a paragraph. Click here to add your own text and edit me.

Time taken to complete: 4 months

Cost of renovation: £120,000

Value of the property pre-renovation: £260,000*

Value of the property after renovation: £550,000*

This property required a full strip back, which included taking the walls back to bricks and removing the ceilings, stud walls and all existing electrics and plumbing.

 

The renovation of this house consisted of:

 

-      Full re-wiring of the property

-      Full re-plumbing of the property

-      Side return and rear wrap around extension

-      Stripped back bare brick feature walls

-      Open plan kitchen installed

-      Bi-folding doors installed into the rear extension

-      Front and back garden landscaped

-      Full interior decoration

* all valuations provided by Patrick Henry estate agency

Before

© 2023 by M&B Remodeling. Proudly created with Wix.com

Let's Discuss 
Your Next Project

Fill out the form, or call us to

set up a free consultation.

25 Balham Hill

Clapham South

London

SW12 9DX

020 7859 4172

  • Instagram
  • facebook
  • youtube